Working with milled timber


As we progressed through the building process we found that we would just master a skill and it was time to move onto another, new, unfamiliar task.  This started with the posts and beams and continued all the way through the build.

We had recycled the timber required for the posts and cut the timber for the beams so when it came to build the structural wall that braces the shouse in the east-west direction we were incredibly surprised how light the timber.  We no longer needed two people to move a piece of timber! 
 
We decided to stick with F17 hardwood for the structural wall.  We figured it was structural so thought it best to build it out of Australian hardwood.  We started by cutting all the required pieces to size then laid the timber out on the slab to make sure all components would be in the right place.


There was only one door to account for an no windows so it was a pretty straight-forward construction.  We were amazed that, within a day, a whole wall was build.  AND put into place.  The structural wall had two load bearing studs which were triple studs with which to hold up the beams.  These essentially acted as posts within the structural wall.

You can see in the photo above that the top plate of the structural wall is in tact.  We decided that it would be stronger like this and elected to chisel out the section where the cross beam would sit when the beam was ready to go up.  This may not have been the brightest move as it was a nightmare to remove the top plate once the wall was up.  Especially because, without the two beams providing support to the wall it was actually surprisingly wobbly.  

The bottom plate was dynabolted to the concrete and the two ends were essentially nail plated to the beam on either end of the wall.  Still, there was a far bit of flex in the wall.  Once the beams were attached, the wall was much stronger but it was not until the joists went up that it really firmed up to our (read my hubby's) satisfaction.

Friday, 17 February 2012

Onwards and upwards

With many teething issues solved, progress increased pace a little.  The first post took us nearly a full week to get into the upright position (including putting the brackets on).  By the last post, we could get it prepared and into place within the same day.

Because the block is subjected to some harrowing winds and we were putting the posts and beams up in the midst of winter we braced posts and beams as we went.  Therefore, as soon as we had two posts up, we put up our first beam.

Some minor adjustments were needed even once it was in place

Padawan and Little Miss celebrating the achievement

Monkey man
We set up a raft of "scaffolding" so we could access the tops of the posts without a ladder (they were not stable until they were secured so we needed something stand-alone).  We made our scaffolds out of 44 gallon drums left over from the in-laws dairy supplies.  My hubby half filled them with water and would move the around on the slab by leaning them over on a 45 degree angle and rolling them.

We had one long board of the scaffold perpendicular to the beam we were putting up and another at right angles to the first so my husband could put his full weight behind the drill to drill a hole for the 200mm bolts to attach the beams to the posts.



I love the way the timber looked, so strong and solid.

I will still struggling on and off with illness at this point and there were many days I was not well enough to go to the block and work.  On these days, the kids and I would stay home.  Guilt would take hold and I was determined to contribute something while I rested.  So, over a number of weeks, I carved out a sign for the block.  It is now embedded into the cutting on the driveway and my hubby tells me that he still smiles every time he drives in as he likes it so much.


It was about this time that we all started to get pretty bored of cold lunches.  The weather was miserable and the choices for the kids for shelter were the shipping container (which was out of bounds if we were using the generator due to the fumes) or the car.   There's only so many things kids can do in a station wagon to entertain themselves for hours on end every day!

Therefore, I needed to get more inventive with the meals I provided at lunch time.  I started making soup which we would take to the block in the thermos.  We'd also often start a small fire in a pit first thing in the morning and put potatoes in there to cook.  It was Padawan's job to rotate them regularly.  This gave him a sense of responsibility and something to do while we worked.  Little Miss would happily toddle around with him, suggesting ways he could turn the spuds over on the days I forgot to pack the BBQ tongs.  Needless to say, there were some days where lunch was very late as the fire had died down and the potatoes were raw but, for the most part, Padawan did a really great job and took pride in having cooked our lunch.

Little Miss enjoying a warm meal




Obstacles abound

Once the posts had been freed of their nails and bolts, we again loaded them onto the trailer in pairs and transported them to the block whenever we went there.  In the time it had taken to cut the beams, the slab had cured.  We had Jimmy Brennan (our local engineer) make us some 10mm steel brackets.  The were perfect.

After much investigation we bought about a billion 150mm dynabolts to attach the brackets to the slab and a ludicrously expensive concrete drill bit.

The concrete had cured beautifully and it proved quite a challenge to drill into it.

Drilling the first hole
Our cordless drill did not cut the mustard.  Although it did generate some cement dust, the resultant hole was about 5mm deep before the battery ran out of charge.  So, not to do things by half, we went out and purchased a more powerful, mains powered drill.  Oh, and a $5000 Lister Petter generator to be able to run it.    To store the generator, we then bought a used shipping container to protect it from the rain.



 The kids thought the shipping container was awesome and danced for ages when it was delivered.

Considering we had a shipping container and I found a bargain timber kitchen on eBay, we went to Melbourne to collect it.  Our luck being what it is, on the return journey I blew out the tyre on the trailer and we spent a very long 3 hours between Leongatha and Foster with the kids waiting for the tow truck with the two dogs in the boot.  In the rain.  Thankfully we happened to stop at the entrance to the Great Southern Rail Trail so we went for multiple short walks along the track, returning to the car frequently to check whether RACV were there yet or not.

The tow company eventually arrived and took our trailer to Foster for a new tyre


With great enthusiasm, we took the opportunity to order the timber for the roof frame too:




Little Miss and Padawan loading the pine floor boards into the shipping container
The almost empty (and very clean) shipping container
With all our new kit, we embarked on drilling holes again and managed to get one in.  The problem was, the dynabolt ended up a mashed up mess when we tried to hammer it into the hole and took my poor, patient husband about 5 hours to remove from the hole.  Being a dynabolt, it was not willing to leave it's home.

Rinse and repeat this process a couple of times over and even my hubby's patience was worn through.  Thankfully, my generous and resourceful Dad purchased a cheap SDS hammer drill for us and with many hours spent on Google, we concocted a puffer out of a straw attached to a hand pump from the swiss ball to clear the cement dust debris from the holes.  With the hammer function (and another ludicrously expensive SDS masonry drill bit) we at least quadrupled our productivity.

The posts are used, as you would imagine, to separate the roof from the floor.  The posts and the beams are the major structural component of the walls.  As such, the beams sit on top of and are attached to the posts.  As there are 14 posts (and one internal structural wall) holding up 21 beams, there were many interesting moments as I tried to work out how to chisel out the tops of the posts in the correct order so all the beams would attach correctly.

Preparing the first post (Padawan mastering the hammer)

Unfortunately, I am not blessed with great spatial skills.  My ability to take an object and transfer it into another orientation is, I have to be honest, abysmal.  Much to my poor husband's frustration, I was constantly checking with him to make sure I was going to be removing the correct portions of timber from the top of the beams.  



I've mentioned before that the posts and beams were heavy, we estimated that the posts weigh in at more than 100kg and the beams at about 60kg.  So to lift them to a height of 2.7m was going to take more than me standing on the slab with my hands in the air while my hubby secured them to their various attachment points.

Looking for a low cost solution served to while away more hours on Google.  Being a researcher at heart, my hubby found an old stonemason design for a crane.  In essence it is three (strong) sticks attached together at the top and tied together at the bottom.  In reality it's about 4 weeks of work (including some time at the forge to get the top piece that attaches the three sticks together and holds the endless winch).  The kids were keen for a challenge to find three straight saplings of even size at 4.5m.  My hubby's a pretty resourceful type and the crane has served us well!

The legs were braced with steel pickets
The first post goes up
You can see in the photo above that there is a strip of waterproof membrane under the bracket.  This will form part of the bottom boxing for the strawbale walls.

The brackets were in place for the first post.  For subsequent posts, though, we had one bracket in place before lifting the post then put the second bracket in to ensure a tight fit.  We found with the first post that we had to chock the post in order for it to fit neatly between the two brackets that had been attached to the slab.




Jimmy Brennan's great work
Chain attachment




















We used a chain around the post, attached with a U-bolt, and connected the endless winch to that.  The only problem with this configuration was that the posts would go up with a lean.  It became my job to 'man' the winch while my hubby would guide the post into place.  Guiding the post makes it sound like the post just wanted to naturally go where it was meant to.  Wrestle with all the force you have in your body is probably a more accurate description of what actually happened.

The endless winch was just within my reach and my shoulders would burn in the iterative way we put the posts into place.  After the second post, I took our step ladder from home to the block and stood on it to work the winch.  It was a lot faster and reduced the amount of massage my hubby needed to deliver when we got home.