Monday, 9 April 2012

The joys of a custom build

There are many people that visit us at the block and they are almost always surprised at the quality of the workmanship.  The gentleman builder and I are amateurs when it comes to building.  I was lucky enough to have a very talented father who endured my 'help' on many home DIY projects over the years.  Being a very patient man, the gentleman builder, like my father before him, endures my 'help' on building the shouse too.
The gentleman builder spends many frustrated hours fixing the 'work' I have done with the best of intentions but that does not come up to his exacting standards.  While I have the enthusiasm, I lack in technique.  I love building and find it very rewarding but I am, alas, not as skilled as my husband or my father.  I have a mean hammer arm and I can render with the best of them but there are many things that I am not so skilled at (skew-nailing and accurate saw work are the first two things come to mind).
Nevertheless, my husband has persevered (perhaps as I work to fund the project; or is that too cynical?) and he has created an incredible purpose-built space that is morphing into a home on an almost daily basis now.
While over Christmas we were dreaming of moving in over Easter, that has not eventuated and there is still a long list of things to do before we can get the building inspector in to sign off on "our" build.
One of the joys of building something yourself, that you have designed and laboured over, is that it becomes an extension of your belief system and values.  As a family, we firmly believe in sustainability.  We love our children and spend a great deal of time with them.  We take pride in the work that we do and make conscious decisions when it comes to things we consider important. 
I love to watch padawan and little miss explore our block and take great pride in the things that they do.  Recently, we rendered the second coat on the south wall and, as a result the tarps on that side of the house came down.  This revealed the view to Corner Inlet from the south-facing window.  The children loved it and asked me to move the table and chairs so they could make use of the wide sills and take in the views.




Also, insects love to be on our house.  We regularly find stick insects on the north wall, sunning themselves and generally being happy.  Last week, I found a grasshopper inside.  Taking time out from the heat, no doubt as it was a particularly warm autumn day.
 To me, this indicates that the house is truly non-toxic.  Insects would not ordinarily choose to make home in something that would cause them damage.  I like that we will be living in a home that is safe.  That will not be off-gassing noxious crap to infect our lungs and cause us distress.  I hope that I will have fewer migraines when we are living in the shouse as I am sure that the fumes from the paint that we used in the house that we are in currently contribute to that particular ailment.

We have one structural and one non-structural wall in the shouse as well as the roof downstairs and in the attic that will be painted.  We have been experimenting with natural casein paints as we cannot afford to buy low VOC paints that are commercially available.

We trialled a number of options, from left to right:
  1. Straight lime putty which has been rejected because it imparts a powdery residue when you rub it
  2. Lime putty with PVA which performed really well but has been rejected because of the smell
  3. Lime putty with PVA and pigment (which we made from crushing some rocks from the driveway) - also rejected due to the smell
  4. Casein paint - recipe needs refining as the batch we made on the test strip below was too watery
  5. Casein paint with pigment - again, the recipe we used for the test strip was too runny
I like the colour of the lime putty and PVA mix but the smell is too offensive in our very inert home.  We're in the process now of trying to perfect a casein paint.

Sunday, 19 February 2012

Waiting, waiting, waiting

While waiting for the grain to mature so the straw could be harvested, we put in place the frame for the door and the windows.  All the windows and the door are second hand.  All are solid timber.  All required (or still require) a lot of work to bring them up to scratch but we felt strongly about not buying new what we could get secondhand.  The money we saved ourselves was an added bonus.

Bedroom window and bathroom window in place

You might be able to see, in the photo above, that we had painted the external brackets with zinc rust proofing paint.

Door frame in place
In the photo above, you can see that we had some leftover hardwood spaced out on the floor.  This was to keep the straw off the floor in case moisture got in.  Moisture is cancer for strawbales.

Not being a patient person, I was chomping at the bit and hanging to get started on constructing the walls.

A top of beams


In October 2010 we started work on the roof structure. 

I was so impressed with the way that the joists looked when they went up.  It was hard work being up at the block and working long hours with no shade and the joist going up was brilliant as it meant that I could nail up an old sheet during the day to cast some shade onto the slab.  The wind, as usual, made it very hard to keep the sheet up but I could generally re-jig it in some way to make shade for the kids every day.

Our joists run in an east-west direction across the beams.  The standard spacing is 900mm but ours are nominally less than that.  My hubby's theory when it comes to building it to over engineer (it's one of the rare times when more is better).  The joists are attached to the beams with skew nails.  We left the middle section of the shouse without joists so we could get the ridge beam up through there when it was time.  This turned out to be a blessing and a curse.  While it made it much easier to get the ridge beam into the roof space, it meant that there was nothing to stand on when trying to secure the ridge beam.  To this day, I have no idea how the gentleman builder managed to do this (as this part was built on one of the days I was at work).  I imagine I never will!


The first two common rafters ready to go up. 
You can see in the photo above that there is a gap between the first two common that are ready to go up.  The gap is to allow for the ridge beam to fit in between the two rafters.  We used a piece of wood to attach the two rafters together to maintain the space for the ridge beam.  This worked pretty well, despite being a rudimentary solution.

You can just see, in the photo below, that we had a string line to ensure that the ridge beam was correctly positioned in the centre of the building.  It was at this point that we realised that there was a 3mm difference between the north wall (east to west) and the south wall.  Considering the scale of the project and the fact that we had used recycled timber for the construction of the base of the building, I was pretty impressed!

Common rafter with ridge beam



Braced for the night



We decided on a hip roof because we are in a high wind area.  Hip roofs are the strongest design if you are not going with trusses.  The reason we did not want to use trusses was two-fold.  Firstly, it was more expensive to buy prefabricated trusses.  Secondly, we wanted to be able to make use of the space in the ceiling for storage.  My brother-in-law recently suggested that adding another metre to the height of the walls and having that in the attic space would have made the upstairs a much more livable.  Pity we didn't get that pearl of wisdom 18 months earlier, really! 






I loved the view from inside was just beautiful.  I hate heights but it was so worth climbing up to see the rafters join together in perfect symmetry.


The roof frame was finished on 12/12/2010.  The bracing was then put on in preparation for the plumbers to come in to put the tin on.
Just to be sure, tie downs were added over the rafters

We then put all the framing in for the door and windows.

Bracing was then added to the roof and the posts where there were no windows or doors.

Roof bracing and fascia painted

Wall bracing


Saturday, 18 February 2012

Working with milled timber


As we progressed through the building process we found that we would just master a skill and it was time to move onto another, new, unfamiliar task.  This started with the posts and beams and continued all the way through the build.

We had recycled the timber required for the posts and cut the timber for the beams so when it came to build the structural wall that braces the shouse in the east-west direction we were incredibly surprised how light the timber.  We no longer needed two people to move a piece of timber! 
 
We decided to stick with F17 hardwood for the structural wall.  We figured it was structural so thought it best to build it out of Australian hardwood.  We started by cutting all the required pieces to size then laid the timber out on the slab to make sure all components would be in the right place.


There was only one door to account for an no windows so it was a pretty straight-forward construction.  We were amazed that, within a day, a whole wall was build.  AND put into place.  The structural wall had two load bearing studs which were triple studs with which to hold up the beams.  These essentially acted as posts within the structural wall.

You can see in the photo above that the top plate of the structural wall is in tact.  We decided that it would be stronger like this and elected to chisel out the section where the cross beam would sit when the beam was ready to go up.  This may not have been the brightest move as it was a nightmare to remove the top plate once the wall was up.  Especially because, without the two beams providing support to the wall it was actually surprisingly wobbly.  

The bottom plate was dynabolted to the concrete and the two ends were essentially nail plated to the beam on either end of the wall.  Still, there was a far bit of flex in the wall.  Once the beams were attached, the wall was much stronger but it was not until the joists went up that it really firmed up to our (read my hubby's) satisfaction.

Friday, 17 February 2012

Obstacles abound

Once the posts had been freed of their nails and bolts, we again loaded them onto the trailer in pairs and transported them to the block whenever we went there.  In the time it had taken to cut the beams, the slab had cured.  We had Jimmy Brennan (our local engineer) make us some 10mm steel brackets.  The were perfect.

After much investigation we bought about a billion 150mm dynabolts to attach the brackets to the slab and a ludicrously expensive concrete drill bit.

The concrete had cured beautifully and it proved quite a challenge to drill into it.

Drilling the first hole
Our cordless drill did not cut the mustard.  Although it did generate some cement dust, the resultant hole was about 5mm deep before the battery ran out of charge.  So, not to do things by half, we went out and purchased a more powerful, mains powered drill.  Oh, and a $5000 Lister Petter generator to be able to run it.    To store the generator, we then bought a used shipping container to protect it from the rain.



 The kids thought the shipping container was awesome and danced for ages when it was delivered.

Considering we had a shipping container and I found a bargain timber kitchen on eBay, we went to Melbourne to collect it.  Our luck being what it is, on the return journey I blew out the tyre on the trailer and we spent a very long 3 hours between Leongatha and Foster with the kids waiting for the tow truck with the two dogs in the boot.  In the rain.  Thankfully we happened to stop at the entrance to the Great Southern Rail Trail so we went for multiple short walks along the track, returning to the car frequently to check whether RACV were there yet or not.

The tow company eventually arrived and took our trailer to Foster for a new tyre


With great enthusiasm, we took the opportunity to order the timber for the roof frame too:




Little Miss and Padawan loading the pine floor boards into the shipping container
The almost empty (and very clean) shipping container
With all our new kit, we embarked on drilling holes again and managed to get one in.  The problem was, the dynabolt ended up a mashed up mess when we tried to hammer it into the hole and took my poor, patient husband about 5 hours to remove from the hole.  Being a dynabolt, it was not willing to leave it's home.

Rinse and repeat this process a couple of times over and even my hubby's patience was worn through.  Thankfully, my generous and resourceful Dad purchased a cheap SDS hammer drill for us and with many hours spent on Google, we concocted a puffer out of a straw attached to a hand pump from the swiss ball to clear the cement dust debris from the holes.  With the hammer function (and another ludicrously expensive SDS masonry drill bit) we at least quadrupled our productivity.

The posts are used, as you would imagine, to separate the roof from the floor.  The posts and the beams are the major structural component of the walls.  As such, the beams sit on top of and are attached to the posts.  As there are 14 posts (and one internal structural wall) holding up 21 beams, there were many interesting moments as I tried to work out how to chisel out the tops of the posts in the correct order so all the beams would attach correctly.

Preparing the first post (Padawan mastering the hammer)

Unfortunately, I am not blessed with great spatial skills.  My ability to take an object and transfer it into another orientation is, I have to be honest, abysmal.  Much to my poor husband's frustration, I was constantly checking with him to make sure I was going to be removing the correct portions of timber from the top of the beams.  



I've mentioned before that the posts and beams were heavy, we estimated that the posts weigh in at more than 100kg and the beams at about 60kg.  So to lift them to a height of 2.7m was going to take more than me standing on the slab with my hands in the air while my hubby secured them to their various attachment points.

Looking for a low cost solution served to while away more hours on Google.  Being a researcher at heart, my hubby found an old stonemason design for a crane.  In essence it is three (strong) sticks attached together at the top and tied together at the bottom.  In reality it's about 4 weeks of work (including some time at the forge to get the top piece that attaches the three sticks together and holds the endless winch).  The kids were keen for a challenge to find three straight saplings of even size at 4.5m.  My hubby's a pretty resourceful type and the crane has served us well!

The legs were braced with steel pickets
The first post goes up
You can see in the photo above that there is a strip of waterproof membrane under the bracket.  This will form part of the bottom boxing for the strawbale walls.

The brackets were in place for the first post.  For subsequent posts, though, we had one bracket in place before lifting the post then put the second bracket in to ensure a tight fit.  We found with the first post that we had to chock the post in order for it to fit neatly between the two brackets that had been attached to the slab.




Jimmy Brennan's great work
Chain attachment




















We used a chain around the post, attached with a U-bolt, and connected the endless winch to that.  The only problem with this configuration was that the posts would go up with a lean.  It became my job to 'man' the winch while my hubby would guide the post into place.  Guiding the post makes it sound like the post just wanted to naturally go where it was meant to.  Wrestle with all the force you have in your body is probably a more accurate description of what actually happened.

The endless winch was just within my reach and my shoulders would burn in the iterative way we put the posts into place.  After the second post, I took our step ladder from home to the block and stood on it to work the winch.  It was a lot faster and reduced the amount of massage my hubby needed to deliver when we got home.


Thursday, 16 February 2012

Return to roots

My hubby and I met while studying forestry at the University of Melbourne.  We both love the outdoors, adore trees and are passionate about the environment.  Studying a degree in forestry gives one skills that most ordinarily don't get.  For example, we spent a week learning to us an axe - sharpen, cross cut and fell.  Naturally, we also spent a fair bit of time on the end of a chainsaw.  Don't get me wrong, there's much more to forest science than chopping trees down but unless you are one of the lucky ones (in my opinion) to move into a career with Parks Victoria then a certain component of any core forestry job involves falling and processing trees into timber or timber products.

In another attempt to save money and get the desired look for the final build that we were hoping for, we decided the best thing was to cut and mill the timber for our beams ourselves.

It's about here that I should probably take a little deviation and talk about the design of our home.  We started planning on building our home before we even got engaged.  In fact, if truth be told, I have been designing homes since before I could use a ruler with any degree of accuracy.  I remember frustrating my Dad no end asking him to draw the houses I had designed in my head.  I'd compile ideas from visiting friends, watching movies (The Sound of Music was life-changing for me and meant that every double story design included a double staircase) and looking at housing ads in the local paper and then get him to draw it.  Whenever he didn't quite understand what I meant, we'd both end up getting flustered.  This lasted until I was about 8 and mastered the use of ruling straight lines and right angles at which point Dad would be able to move from architect to critic and admirer.  

Anyway...  We had always planned to have a large (by modern standards) family.  We are both home bodies and get great enjoyment from being in our own environment.  We like to grow and preserve our own food.  Add to that the fact that my family are based in Melbourne; we were planning on living in country Victoria (aiming for Leongatha which is half way between both sets of grandparents) and we have friends scattered across Australia and overseas who we like to have come and stay with us and you'll see why our final house design included 5 bedrooms, 3 bathrooms, open plan living, a library, a generous laundry and a pantry that was bigger than our bedroom.  My husband is a very bright man and decided that it was probably not going to be feasible to build such a grand design while based in Melbourne, working full time and with two young children.  So, we decided that we would build a shed in the same design as the house, master any techniques we'd need and then live in the shed while we built the house.

We spent a great deal (read months if not years) researching different materials with which to build a house.  My husband had always dreamed of building a stone house.  We didn't have to investigate that option for very long before we ruled it out.  Unfortunately we are not millionaires and it seemed to us that we would need to be just that if we were going to build out of bluestone.

I suggested strawbale and we umed and ahed for a while until my husband settled on mud brick.  For a while my husband was convinced we were onto a winner.   The thought of making a thousand mud bricks by hand was not appealing, I must admit.  While I liked the idea that the dirt we removed for the cutting would be recycled and used to build our walls I just couldn't see myself moulding clay into bricks and laying them to bake in the sun.

Then he investigated rammed earth and that was all the rage.  Until we read that someone in southern Victoria had no end of trouble with rammed earth being affected by driving rains.  As we had bought a block in an area that has an annual rainfall nearing 1000mm per year and where the prevailing westerly winds are sufficient enough to justify a windfarm and we decided that mud brick was off the list.  So we did some further investigation and found a product called timbercrete.  Finally we thought we were onto a winner.  We spoke at length to the manufacturers, had the MSDS and independent investigation report sent though and I had even picked the finish I liked.  We travelled to Mirboo North to see a home made from timbercrete and fell in love.  While it was not stone, it looked close enough for my hubby and we were sold on the insulation and termite resistant properties and the fact that it can be nailed and screwed just like timber.  I particularly liked the fact that the bricks would be manufactured elsewhere and the integrity of my skin would not be compromised by working for long hours with moisture-sapping clay.

Unfortunately, neither of us were bricklayers so once we factored into the cost of the build the fact that we would have to buy in labour we reluctantly admitted that we could not afford it.

So, back to the drawing board we went.  I again suggested strawbale and we looked in earnest into the costs and required skill level to construct a post and beam strawbale house.  While you can make structural strawbale homes, we like timber and if I had to have exposed posts then they were going to be timber rather than steel or concrete.  We found an engineer willing to work with us and he scrawled all over the plans we had drawn and we submitted them to our building inspector and we were on our way.

Fortunately, the Alberton West bridge had been pulled down in about 2001 and the shire had not wanted to cart the timber away so it was stacked on my in-laws farm.  Much negotiations took place and my in-laws agreed that we could pick over the stack and take the timber we needed for the posts.  The beams we would cut ourselves.

So, we bought a brilliant Stihl with a ripping blade and a milling attachment and again managed to convince my in-laws to let us make use of some trees that had fallen in a patch of bush on one of their farms.

In April 2009, while the slab took 6 weeks to cure, my hubby worked like a beast to mill the timber for the beams.  It was at about this point that I started to become thankful that our journey into building started with digging.  Green timber weighs a ton!
Pushing the saw was tough work
Beam 1 (out of 12)


Falling a tree

Hubby displaying his awesome forestry skills

Kit
 Entertaining children while trying to work with a chainsaw is not an easy feat.  Thankfully, being autumn there were pockets of mushrooms to be found.  We'd send the kids off to find the best sample of each type while we worked (in about 10 minute blocks) and then I would go and have a look at them.
We found an array of mushrooms
 We also found huge patches of native orchids

Stripping bark

A board was used to ensure the first cut was straight


While sourcing timber we found a beaten up David Brown 880





The kids, especially Master Padawan, thought it was awesome and tried to convince us to do it up and take it to the block with us.  Unfortunately, after much research and attempts to get parts, my hubby decided it was not worth rescuing.

 The beams were finally cut in July 2010 and made an impressive stack




Next was to transport the posts.  Again we were thankful for a warm up.  While the beams were heavy the posts, at a minimum 200x200mm, and ironbark at minimum 3m lengths were NOT light.







Young Padawan was convinced he could use the chainsaw so my hubby decided he could try to hold it while it was off to see how heavy it was

Padawan attempting to smile while he holds the weight of the 660
Hubby, being who he is, showed Padawan how much of a difference man muscles make.  


He-Man

Needless to say, with only woman muscles (and as much as I am an advocate that woman can do what men can, they can't), I was reduced to moving off-cuts out of the way and loading them onto the trailer to salvage for firewood or to turn into charcoal for the forge.  The nails were salvaged for use in the forge and some were turned into pegs for a coat rack that my hubby was commissioned to make.



The kids were glad to be out of the mosquito infested forest and had a ball running around in the paddock while we worked.  It helped that the stack of bridge timbers is on the main road between home and Yarram and that the in-laws travel the same route so the kids were lucky to have a couple of visits from Grandpa while we were working.  
 
Due to the weight of the timber, we could only transport 2 posts at a time in our trailer.



 We transported the posts home as an interim step as we needed power to be able to remove all the nails and bolts before transporting them to the block.